|
Combined Cycle Power Plant25th August 2005 Plant Manager Bob Threlkeld (second from left) provided an insight into the costs of operation of the Tenaska Central Alabama Plant. The tour was being lead by Stan Graves (third from right) who has extensive experience in Coal Bed Methane operations and applications.
|
||||||||||||
|
|||||||||||||